DSM PRS 22 Integration
Sector: Water Supply and Storage • Location: Placerville, California, United States of America
Source: Dodge
This project evaluates modification or replacement required to integrate the valves at DSMPRS22 into the PLC, to allow for operator control for flow and tank level control. The El Dorado Irrigation District may be seeking a consultant to provide design for DSM PRS 22 Integration
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project evaluates modification or replacement required to integrate the valves at DSMPRS22 into the PLC, to allow for operator control for flow and tank level control. The El Dorado Irrigation District may be seeking a consultant to provide design for DSM PRS 22 Integration |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
