DSWWTP UV System Replacement
Pre-design · Texas · Last reported Apr 2023
Source: Dodge USA
The Dallas Salmon WWTP was converted from Chlorine Gas to Ultra-violet Disinfection in 2000. At the time of installation the selected UV system was state of the art and continues to serve it purpose well, to date. The WEDECO Tak 55 system is migrating into an unsupported lifecycle phase where replacement parts are no longer manufactured. Surplus availability will continue decrease, eventually reac
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- League City, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DSWWTP UV System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dallas Salmon WWTP was converted from Chlorine Gas to Ultra-violet Disinfection in 2000. At the time of installation the selected UV system was state of the art and continues to serve it purpose well, to date. The WEDECO Tak 55 system is migrating into an unsupported lifecycle phase where replacement parts are no longer manufactured. Surplus availability will continue decrease, eventually reaching an obsolete unsupported stage. Many design improvements have and continue to occur within th... |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | League City |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
