logo

DTEK Botievo Wind Farm

Sector: Wind • Location: Ukraine

Source: World Bank Group

Project
Active

DTEK developed the 200MW Botievo wind farm, Zaporizhzhya Region. The project was to be developed in two phases, the first phase of consisted of 30 turbines totaling 90MW. The second phase consisting of 100MW.

Commissioning of the second phase was expected for 2014. The first phase was expected to be fully connected to the grid by late-2013. The wind turbines are supplied by Vestas, 30 turbines o

Project Information FAQ

Project Information

4 Q
The project “DTEK Botievo Wind Farm” is an infrastructure initiative in the Wind sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

DTEK developed the 200MW Botievo wind farm, Zaporizhzhya Region. The project was to be developed in two phases, the first phase of consisted of 30 turbines totaling 90MW. The second phase consisting of 100MW. Commissioning of the second phase was expected for 2014. The first phase was expected to be fully connected to the grid by late-2013. The wind turbines are supplied by Vestas, 30 turbines of the V112 type (3.0MW each). The firm's german subsidiary Vestas Deutschland is also in charge of constructing the wind farm. The project received a feed-in tariff of 0.1131 EUR/kWh, paid in domestic currency but pegged to the EURO. The tariff was guaranteed by law until 2030, for projects commissioning before 2014. Total project cost was estimated at EUR350 (US$458 million). Financial closure was unavailable. DAIBN, DTEK starts up Botievo wind farm, 4 October 2012

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data