DTRT CMT Expan.
Active · Ghana
Source: International Finance Corporation (IFC)
The proposed IFC loan of up to $8 million is to support DTRT Group’s (“DTRT” or the “Company”), expansion of their Cut-Make-Trim (CMT) operations. This includes the establishment of a new 31,000 sqm upgraded garment factory area to increase capacity from 50 sewing lines to 107 sewing lines by 2026 (the “Project”). Founded in Ghana in 2013, DTRT focuses on sportswear and workwear garment production
- Status
- Prospective
- Sector
- Warehouse, Manufacturing (Industrial), Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about DTRT CMT Expan.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC loan of up to $8 million is to support DTRT Group’s (“DTRT” or the “Company”), expansion of their Cut-Make-Trim (CMT) operations. This includes the establishment of a new 31,000 sqm upgraded garment factory area to increase capacity from 50 sewing lines to 107 sewing lines by 2026 (the “Project”). Founded in Ghana in 2013, DTRT focuses on sportswear and workwear garment production for export to the United States and European markets. Currently, DTRT’s operations include a CMT factory with 35 sewing lines and associated quality control functions located in Accra with a second production site located in Tema, which has 15 sewing lines along with raw material stores and fabric cutting functions. The site identified for the Company’s CMT expansion is located within the Tema Free Zone and occupies 31,000 sqm. The new manufacturing facility will be built for and leased by the Company via a build-to-suit lease agreement with a leading local property developer for a period of at least 10 years. The main equipment to be fitted as part of the expansion includes sewing machines for more than 50 production lines, along with fabric spreaders, auto-cutters, racking systems, embroidery and screen-printing machines from reputable international suppliers who will deliver, fit and provide training on equipment use. Construction on the expanded CMT factory is expected to commence in early 2023 with the plant being commissioned by the end of 2023. For more information about DTRT facilities and production activities see http://www.dtrtapparel.com/ |
Original sector | K-CA - Garment and Apparel (Without Fabric , Excluding Footwear) |
Location
Country | Ghana |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Warehouse, Manufacturing (Industrial), Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in Ghana
- Bridge Power Project Tema
- Tema Container Terminal
- COVID-19 HEALTH RESPONSE GHANA
- Establishment of a Shea Processing factory
- FPSO Kwame Nkrumah MV 21
- Ghana - Particle Board Manufacturing
- Ghana - UT Bank Limited Trade Finance Line of Credit
- Ghana - Incentive-Based Risk-Sharing System for Agricultural Lending Project (GIRSAL)
