Du Bois Hydroelectric Power Replacement
Pre-design · Manitoba · Last reported Apr 2024
Source: Dodge USA
The two levels of government are investing $314 million into the Pointe Du Bois hydroelectric power station on the Winnipeg River, northeast of Winnipeg. Hydro is planning to replace eight generating units, which are nearing their end of life, at the 110-year old plant. The upgrade will add 52 megawatts of electricity output to the grid and extend the station's life to at least 2055. The project i
- Status
- Prospective
- Sector
- Hydro, Government, Power Generation (CCGT), Commercial
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Du Bois Hydroelectric Power Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The two levels of government are investing $314 million into the Pointe Du Bois hydroelectric power station on the Winnipeg River, northeast of Winnipeg. Hydro is planning to replace eight generating units, which are nearing their end of life, at the 110-year old plant. The upgrade will add 52 megawatts of electricity output to the grid and extend the station's life to at least 2055. The project includes a new transmission line connecting Pointe Du Bois to a substation in the Whiteshell. |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Government, Power Generation (CCGT), Commercial |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
