logo

Dual Span Structure Removal

Sector: Water Supply and Storage • Location: Cambridge, Illinois, United States of America

Source: Dodge USA

Project
Closed

Removal of existing dual span structure (21' x 60') and replacement with single span (24' x 64') deck on PPC deck beams with 2:1 sloping abutments and in-stream work to provide adequate waterway, including minor dredging operations east of the structure to remove stream impoundments. 321 cu. yd. channel exc.; 505 cu. yd. furnish exc.; 277 tons stone rirprap; 489 tons agg. surf. cse.; 1 removal exi

Status
Closed
Sector
Water Supply and Storage, Bridge, Road, Government, Commercial
Location
Cambridge, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Dual Span Structure Removal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dual Span Structure Removal” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambridge, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removal of existing dual span structure (21' x 60') and replacement with single span (24' x 64') deck on PPC deck beams with 2:1 sloping abutments and in-stream work to provide adequate waterway, including minor dredging operations east of the structure to remove stream impoundments. 321 cu. yd. channel exc.; 505 cu. yd. furnish exc.; 277 tons stone rirprap; 489 tons agg. surf. cse.; 1 removal exist. str.; 118 cu. yd. str. exc.; 23 cu. yd. conc. str.; 1504 sq. ft. 27" p.p. deck beams; 3860 lb...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Cambridge

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Government, Commercial

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project