Dubai Energy Demand Increase 2024
Sector: Water Supply and Storage • Location: Dubai, United Arab Emirates
Source: ZAWYA
Dubai’s energy demand increased by 5.4 percent in 2024, reaching 59,594 Gigawatt-hours (GWh), compared to 56,516 GWh in 2023. The installed generation capacity has reached 17.179 GW, with clean energy sources accounting for 20 percent of the total capacity, supporting Dubai’s Clean Energy Strategy 2050.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Dubai, United Arab Emirates
- Updated
- 22 Jul 2026
- Source
- ZAWYA
ConstructChat
Ask ConstructChat about Dubai Energy Demand Increase 2024
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dubai’s energy demand increased by 5.4 percent in 2024, reaching 59,594 Gigawatt-hours (GWh), compared to 56,516 GWh in 2023. The installed generation capacity has reached 17.179 GW, with clean energy sources accounting for 20 percent of the total capacity, supporting Dubai’s Clean Energy Strategy 2050. |
Original sector | Energy |
Location
Country | United Arab Emirates (UAE) |
State | Dubai |
City | Dubai |
Source
Source | ZAWYA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United Arab Emirates
- Al Dhafra Solar Project Abu Dhabi
- Al Layyah CombinedCycle Power Plant Sharjah UAE
- Taweelah A1 Power and Desalination Plant Abu Dhabi
- Jebel Ali Refinery Expansion Project
- NFPC’s Food Production Facility, Abu Dhabi
- Gulf Pharmaceutical Industries (Julphar) Insulin Production Facility
- 375 MLD Jebel Ali Sewage Treatment Plant
- UAE Nuclear Power Plant Unit 1~4
