logo

Dubai International Airport, United Arab Emirates

Sector: Advanced Electronics • Location: United Arab Emirates

Source: Bechtel

Project
Close

Dubai International Airport,A 10-year plan for a massive upgrade

The Dubai Government selected Bechtel to design, manage and complete Dubai International Airport construction project for improved airport operations. The ten-year plan called for a massive and widely varied set of components, including a satellite concourse with 28 gates, 42 loading bridges, and 221 check-in counters —1.3 million s

Project Information FAQ

Project Information

5 Q
The project “Dubai International Airport, United Arab Emirates” is an infrastructure initiative in the Advanced Electronics sector, located in United Arab Emirates. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dubai International Airport,A 10-year plan for a massive upgrade The Dubai Government selected Bechtel to design, manage and complete Dubai International Airport construction project for improved airport operations. The ten-year plan called for a massive and widely varied set of components, including a satellite concourse with 28 gates, 42 loading bridges, and 221 check-in counters —1.3 million square feet (120,770 square meters) in all, duty-free and specialty shops, a 100-room, five-star luxury hotel, conference, business and entertainment centers, and restaurants. Bechtel served as designer, project manager, and construction manager for the airport and runway system, terminals, access roadways, parking facilities, and a cargo complex. The airport is a focal-point for the growth of business and tourism throughout the United Arab Emirates. The cargo and free-trade-zone complex earned the International Cargo Airport Forum’s Best Cargo Airport award. Nearly 13,000 metric tons of steel was used to construct the frame of the new concourse. Image gallery Innovative CADD improved the Dubai International Airport Design efforts set new standards in the use of computer technology and complex simulations to develop alternatives, provide for more informed decision-making, explore operations issues, and improve public outreach. We planned all construction activities to minimize the impact on existing airport operations. Using Bechtel’s worldwide computer network, a highly skilled team completed all architectural design using state-of-the-art computer-aided design and drafting (CADD) and document tracking systems. Our network facilitated design review and electronic exchange of CADD design drawings among Bechtel offices worldwide (including San Francisco, London, and New Delhi) and the project team in Dubai, increasing speed and accuracy. Virtual reality simulations aided decision-making, allowing our customer to experience the result during the design stage. Automated simulation studies also helped establish planning and design criteria for aircraft movement and passenger flow. Bechtel’s use of 3-D modeling enabled the project team to run electronic interference—checking, for example, on ductwork, baggage systems, and structural steel. It enabled us to identify problems during the design process rather than during the construction phase, when addressing such issues typically costs a lot of time and money. Decades of continuous service Bechtel first teamed with the Government of Dubai on airport renovation and expansion in 1977, and has been at work ever since. More than 100 projects have been completed by Bechtel in the United Arab Emirates since 1962. Construction facts Major aprons and taxiways to support the new satellite concourse A charter terminal that handles more than 500 passengers per hour A new 13,000-foot (4,000-meter) runway and taxi system, including state-of-the-art navigational aids and computerized airfield lighting systems A cargo and free-trade-zone complex A new automated baggage handling system A new air traffic control tower, a fuel farm, a central utility plant, fire stations, and associated airside facilities  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data