Dublin Boulevard Widening Project
Sector: Road • Location: Colorado Springs, Colorado, United States
Source: Colorado Springs Gazette
Project to widen Dublin Boulevard between Fieler Drive and Mustang Rim Drive in Colorado Springs from two lanes to four lanes with two shoulders, including new 10-foot multi-use paths, a raised median, and a traffic signal at Issaquah Drive. The project closure originally scheduled for May 27, 2025, has been postponed for at least two weeks due to unforeseen site conditions and permitting delays.
- Status
- Failure
- Sector
- Road, Government
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Colorado Springs Gazette
ConstructChat
Ask ConstructChat about Dublin Boulevard Widening Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project to widen Dublin Boulevard between Fieler Drive and Mustang Rim Drive in Colorado Springs from two lanes to four lanes with two shoulders, including new 10-foot multi-use paths, a raised median, and a traffic signal at Issaquah Drive. The project closure originally scheduled for May 27, 2025, has been postponed for at least two weeks due to unforeseen site conditions and permitting delays. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Colorado Springs Gazette |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
