logo

Dublin Port Third and Final Masterplan Project

Sector: Car parking • Location: Ireland

Source: InfraPPPWorld

Project
Project In Planning

The project involves the Third and Final Masterplan (3FM) needed to complete the development of Dublin Port and bring it to its ultimate and final capacity by 2040 in Ireland. The project has seven main elements:

A new 2.2km Southern Port Access Road (SPAR) will link the north and south port areas and will include a 190m bridge, with a 45m lifting section to the east of the Tom Clarke Bridge. Giv

Project Information FAQ

Project Information

5 Q
The project “Dublin Port Third and Final Masterplan Project” is an infrastructure initiative in the Car parking sector, located in Ireland. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in planning

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the Third and Final Masterplan (3FM) needed to complete the development of Dublin Port and bring it to its ultimate and final capacity by 2040 in Ireland. The project has seven main elements: A new 2.2km Southern Port Access Road (SPAR) will link the north and south port areas and will include a 190m bridge, with a 45m lifting section to the east of the Tom Clarke Bridge. Giving port traffic and other heavy goods traffic on the Poolbeg Peninsula a designated route will divert heavy goods traffic from local roadways. The container terminal in front of the ESB’s Poolbeg Power Station has the capacity to handle 353,000 units (600,000 TEU) annually. The construction of a new Roll On / Roll Off (Ro-Ro) terminal north of the Sean Moore Roundabout. With Brexit, there will be an increase in the amount of direct traffic coming from Europe, and this 12.6-ha site will accept trucks with containers. A new 325 m ship turning circle in front of Pigeon House Harbour. A 1-ha utility area to accommodate third-party services, such as the district heating system that will be supplied by the Covanta waste-to-energy plant. A new 'Maritime Village' which will provide enhanced facilities for a range of users including sailing and rowing clubs, sea scouts, the Nautical Trust and local boat owners. Community Facilities including a 2.8 ha Port Park, an adjacent landscaped area with 5G floodlit playing pitches, a dog run, 5.5 km of active cycle and pedestrian paths.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data