logo
ProjectProject In Planning

Dublin Port Third and Final Masterplan Project

Project in planning · Dublin

Source: InfraPPPWorld

The project involves the Third and Final Masterplan (3FM) needed to complete the development of Dublin Port and bring it to its ultimate and final capacity by 2040 in Ireland.The project has seven main elements:Anew 2.2km Southern Port Access Road (SPAR) will link the north and south port areas and will include a 190m bridge, with a 45m lifting section to the east of the Tom Clarke Bridge. Giving

Status
Prospective
Sector
Bridge, Power Generation (CCGT), Power Transmission, Seaport, Road, Government
Location
Dublin, Ireland
Updated
19 Nov 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Dublin Port Third and Final Masterplan Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dublin Port Third and Final Masterplan Project” is an infrastructure initiative in the Bridge sector, located in Dublin, Ireland. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Status

Original status

project in planning

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project involves the Third and Final Masterplan (3FM) needed to complete the development of Dublin Port and bring it to its ultimate and final capacity by 2040 in Ireland.The project has seven main elements:Anew 2.2km Southern Port Access Road (SPAR) will link the north and south port areas and will include a 190m bridge, with a 45m lifting section to the east of the Tom Clarke Bridge. Giving port traffic and other heavy goods traffic on the Poolbeg Peninsula a designated route will divert heavy goods traffic from local roadways.The container terminalin front of the ESB’s Poolbeg Power Station has the capacity to handle 353,000 units (600,000 TEU) annually.The construction of a new Roll On / Roll Off (Ro-Ro) terminal north of the Sean Moore Roundabout. With Brexit, there will be an increase in the amount of direct traffic coming from Europe, and this 12.6-ha site will accept trucks with containers.A new 325 m ship turning circle in front of Pigeon House Harbour.A 1-ha utility area to accommodate third-party services, such as the district heating system that will be supplied by the Covanta waste-to-energy plant.A new 'Maritime Village' which will provide enhanced facilities for a range of users including sailing and rowing clubs, sea scouts, the Nautical Trust and local boat owners.Community Facilities including a 2.8 ha Port Park, an adjacent landscaped area with 5G floodlit playing pitches, a dog run, 5.5 km of active cycle and pedestrian paths.

Original sector

Transport, Social & Health

Budget

Location

Country

Ireland

State

Dublin

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Bridge, Power Generation (CCGT), Power Transmission, Seaport, Road, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project