DUBROVNIK INFRASTRUCTURE
Sector: Water Supply and Storage • Location: Yugoslavia, former
Source: World Bank Group
The water supply component would comprise the following: (a) extensions of the Komolac pumping station and installation of two additional pumps; (b) new 1.4 km rising main from the pumping station to the tunnel through Srdj Mountain; (c) construction of a 2,000 m3 reservoir at Babin Kuk; (d) extensions and renovations of the distribution system; (e) acquisition of land; and (f) engineering design,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The water supply component would comprise the following: (a) extensions of the Komolac pumping station and installation of two additional pumps; (b) new 1.4 km rising main from the pumping station to the tunnel through Srdj Mountain; (c) construction of a 2,000 m3 reservoir at Babin Kuk; (d) extensions and renovations of the distribution system; (e) acquisition of land; and (f) engineering design, supervision and project administration. The wastewater component would comprise: (a) construction of 13.6 km of network sewers and 8.2 km of collector sewers; (b) modifications to existing sewers; (c) installation of four automatically operated pumping stations; (d) construction of a treatment plant for communition and removal of floatables; (e) construction of an outfall sewer south of the cliff face of Petka Hill, including 1.3 km of undersea pipeline terminating in a diffuser section at a depth of 97 m; (f) acquisition of land; (g) engineering design, supervision and project administration; and (h) equipment for operation and maintenance of the wastewater system. In addition, headquarter's offices and workshops would be expanded. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
