Dufferin Street Sanitary Sewer - Replacement of vitrified clay pipe
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
OBJECTIVE: The Town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. SCOPE: The scope of this project includes the replacement of 352 metres of 300-375mm diameter vitrified clay sanitary sewers from Cen
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | OBJECTIVE: The Town is actively adopting wastewater infrastructure renewal projects that improve operation and maintenance requirements, reduce inflow and infiltration, provide enhancements to the natural environment and support long term sustainable infrastructure. SCOPE: The scope of this project includes the replacement of 352 metres of 300-375mm diameter vitrified clay sanitary sewers from Central Avenue to the Niagara Parkway that were constructed in 1925. The sanitary sewer is in a poor structural state and is beyond the end of its service life, as such, replacement of the sanitary sewer is the recommended rehabilitation alternative along with the replacement of maintenance holes and sanitary laterals. This is a priority project for the Town. Town Council has accelerated this project to design in 2016 and construction in 2017 through administrative report IS-22-2016. This project was originally forecast for design in 2018 with construction forecast for 2019. The design for this project is currently being completed by an engineering design firm with a planned 2017 construction start. OUTPUT: The estimated reduction in stormwater (inflow & infiltration) entering the wastewater distribution system is approximately 2,700 cubic meters per annum as a direct result of the replacement of the sanitary sewer, maintenance holes and service laterals. This project will directly contribute to reduce point source sanitary overflows to meet both regulatory requirements and objectives of the remedial action plan for the Niagara River. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
