logo
ProjectPre-Design

Duke Point Terminal Expansion

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The objective of this project is to lengthen the existing berth face from 182 m to 325 m and use the two recently relocated 80 foot gauge fully electric quay cranes to service marine container vessels and barges simultaneously. The existing diesel-powered quay crane will be decommissioned and removed. To accommodate the anticipated future use of the site, the proposed terminal expansion will: Enla

Status
Prospective
Sector
Tunnel, Commercial, Automotive, Manufacturing (Industrial), Warehouse, Power Generation (CCGT), Power Transmission, Road
Location
Nanaimo, British Columbia, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Duke Point Terminal Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Duke Point Terminal Expansion” is an infrastructure initiative in the Tunnel sector, located in Nanaimo, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The objective of this project is to lengthen the existing berth face from 182 m to 325 m and use the two recently relocated 80 foot gauge fully electric quay cranes to service marine container vessels and barges simultaneously. The existing diesel-powered quay crane will be decommissioned and removed. To accommodate the anticipated future use of the site, the proposed terminal expansion will: Enlarge and lengthen the existing berth face from 182 m to 325 m including securing dolphins; Allow l...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Nanaimo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Tunnel, Commercial, Automotive, Manufacturing (Industrial), Warehouse, Power Generation (CCGT), Power Transmission, Road

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project