Duluth Pinecrest Area Sewer System
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope - Construction of a sanitary sewer collection system consisting of approximately 10,400 LF of 8-inch gravity sewer, 680 VF of standard and composite polymer concrete manholes, 240 LF steel cased jack and bore under a rail road, demolition of an existing wastewater pump station, 3,600 LF of 6-inch and 8-inch DIP water main, isolation gate valves, fire hydrants, connections to existing water m
- Status
- Closed
- Sector
- Steel, Rail, Waste Processing and Treatment, Water Supply and Storage, Road, Cement, Chemical (Industrial), Government, Metal, Commercial, Manufacturing (Industrial)
- Location
- Lawrenceville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Duluth Pinecrest Area Sewer System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - Construction of a sanitary sewer collection system consisting of approximately 10,400 LF of 8-inch gravity sewer, 680 VF of standard and composite polymer concrete manholes, 240 LF steel cased jack and bore under a rail road, demolition of an existing wastewater pump station, 3,600 LF of 6-inch and 8-inch DIP water main, isolation gate valves, fire hydrants, connections to existing water mains, abandonment of an existing water mains, asphalt paving restoration, erosion and sedimentati... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Lawrenceville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Rail, Waste Processing and Treatment, Water Supply and Storage, Road, Cement, Chemical (Industrial), Government, Metal, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
