logo
ProjectPassed Final Review, Pending Approval

Dunarea East wind Romania

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

The development, construction and operation of up to 315 MW wind farm located in Deleni, Romania in Constanta County, Southeastern Romania (the “Project”). The Project is owned by Midmar Callatis S.R.L, an SPV incorporated in Romania and owned by Rezolv Energy S.A. ("Rezolv Energy"). Rezolv Energy is an independent renewable energy producer majority backed by Actis, a leading global investor in su

Status
Prospective
Sector
Road, Wind, Solar, Power Generation (CCGT), Commercial, Raw Materials, Residential
Location
Romania
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Dunarea East wind Romania

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Dunarea East wind Romania” is an infrastructure initiative in the Road sector, located in Romania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

passed final review, pending approval

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The development, construction and operation of up to 315 MW wind farm located in Deleni, Romania in Constanta County, Southeastern Romania (the “Project”). The Project is owned by Midmar Callatis S.R.L, an SPV incorporated in Romania and owned by Rezolv Energy S.A. ("Rezolv Energy"). Rezolv Energy is an independent renewable energy producer majority backed by Actis, a leading global investor in sustainable infrastructure. Download zip package in English Download zip package in Romanian Website: https://rezolv.energy/project/dunarea-east-west-wind-farm/ Rezolv Energy info@rezolv.energy Rezolv Energy s.r.o. Amazon Court, Karolinská 661/4 180 00 Praha 8, Czech Republic Tel +420 227 316 222 EBRD Resident Office: Address: Metropolis Center, 56-60, Iancu de Hunedoara Bd., 3rd floor, West Wing, Sector 1, Bucharest, Romania Tel +40 21 202 7100 Rezolv Energy info@rezolv.energy Rezolv Energy s.r.o. Amazon Court, Karolinská 661/4 180 00 Praha 8, Czech Republic Tel +420 227 316 222

Original sector

Energy

Location

Country

Romania

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Wind, Solar, Power Generation (CCGT), Commercial, Raw Materials, Residential

Article published date

2026-10-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project