logo
ProjectClosed

Duncan Hall MCC Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Duncan Hall Science building is a multi-use lab and classroom facility eight story building, including a basement, with a building square footage of 306,999. Originally built in two phases, the north section was built in 1965, and the south section was built in 1969, primarily constructed from concrete. The existing electrical system included in the scope of work primarily serves HVAC and mechanic

Status
Closed
Sector
Commercial, Cement, Education, Power Generation (CCGT), Government
Location
San Jose, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Duncan Hall MCC Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Duncan Hall MCC Replacement” is an infrastructure initiative in the Commercial sector, located in San Jose, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Duncan Hall Science building is a multi-use lab and classroom facility eight story building, including a basement, with a building square footage of 306,999. Originally built in two phases, the north section was built in 1965, and the south section was built in 1969, primarily constructed from concrete. The existing electrical system included in the scope of work primarily serves HVAC and mechanical system motor loads. The main focus of this project is to replace existing Motor Control Center...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Jose

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Education, Power Generation (CCGT), Government

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project