logo

Dungowan Pumped Hydro Project

Sector: Hydro • Location: Australia

Source: International Water Power

Project
Planned

A pumped storage plant with 300MW capacity and 10 hours of storage, positioned downstream from an existing dam. The project was acquired by EDF Australia from Mirus Energy in 2023.

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Water Supply and Storage
Location
Australia
Updated
22 Jul 2026
Source
International Water Power

ConstructChat

Ask ConstructChat about Dungowan Pumped Hydro Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dungowan Pumped Hydro Project” is an infrastructure initiative in the Hydro sector, located in Australia. Taiyo aggregates data on it from International Water Power.

Participants

Company

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A pumped storage plant with 300MW capacity and 10 hours of storage, positioned downstream from an existing dam. The project was acquired by EDF Australia from Mirus Energy in 2023.

Original sector

Energy

Location

Country

Australia

Source

Source

International Water Power

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Water Supply and Storage

Article published date

2025-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project