Dunkin Remodel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
"interior modifications- existing partition walls to demolish and new partitions where indicated on floor plan. New finishes as per floor finish plan and interior elevations. Existing flooring to replace according floor finish plan. Existing ceiling grid, tiles and light fixtures to be removed & replaced with new as per demolition plan and rcp. plumbing: - reconnect new equipment to existing sanit
- Status
- Closed
- Sector
- Consumer Products, Water Supply and Storage, Power Generation (CCGT), Commercial, Raw Materials
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Dunkin Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | "interior modifications- existing partition walls to demolish and new partitions where indicated on floor plan. New finishes as per floor finish plan and interior elevations. Existing flooring to replace according floor finish plan. Existing ceiling grid, tiles and light fixtures to be removed & replaced with new as per demolition plan and rcp. plumbing: - reconnect new equipment to existing sanitary & water lines. Electrical: replace or relocate electrical devices per electrical plans mechan... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Water Supply and Storage, Power Generation (CCGT), Commercial, Raw Materials |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
