Durand 12th Ave E Improvements
Closed · Wisconsin · Last reported Dec 2023
Source: Dodge USA
The work, in general, will include the approximate quantities and items listed below: Traffic Control 1 ls Clearing and Grubbing 38 ID Pavement Removal 700 sy Excavation 320 cy Crushed Aggregate Base 160 cy Hot Mix Asphalt, Binder 2 500 sy Hot Mix Asphalt, Surface 2 500 sy Concrete Curb and Gutter, 30 Barrier 320 lf Concrete Driveways, 6 260 sf Topsoil, Turf, Grasses, Erosion Mat 500 sy
- Status
- Closed
- Sector
- Cement, Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Durand, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Durand 12th Ave E Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work, in general, will include the approximate quantities and items listed below: Traffic Control 1 ls Clearing and Grubbing 38 ID Pavement Removal 700 sy Excavation 320 cy Crushed Aggregate Base 160 cy Hot Mix Asphalt, Binder 2 500 sy Hot Mix Asphalt, Surface 2 500 sy Concrete Curb and Gutter, 30 Barrier 320 lf Concrete Driveways, 6 260 sf Topsoil, Turf, Grasses, Erosion Mat 500 sy |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Durand |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
