Durham Utilities - Pettigrew Storage Site Improvements
Sector: Waste Processing and Treatment • Location: Durham, North Carolina, United States of America
Source: Dodge
The Project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of a new perimeter security fence for a material storage lot for the city of Durham. Along with the perimeter fence, there will be the installation of a concrete pad to replace existing open grass and the construction of an additional driveway east of the ex
- Status
- Closed
- Sector
- Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Consumer Products, Cement, Government, Manufacturing (Industrial)
- Location
- Durham, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Durham Utilities - Pettigrew Storage Site Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of a new perimeter security fence for a material storage lot for the city of Durham. Along with the perimeter fence, there will be the installation of a concrete pad to replace existing open grass and the construction of an additional driveway east of the existing driveway. The new driveway will have an automatic gate. The concrete pad will serve as a d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Durham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Raw Materials, Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Consumer Products, Cement, Government, Manufacturing (Industrial) |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
