logo
ProjectClosed

Durham WRRF Digester Phase 6B

Sector: Water Supply and Storage • Location: Tigard, Oregon, United States of America

Source: Dodge

Construct and commission a new 1.3-million gallon, cast-in-place concrete, anaerobic digester with a vertical mixer mixing system (new digester). b. Install and commission new digester support systems including, but not limited to, a new spiral heat exchanger, hot water pump and piping, digester sludge recirculation pump and piping, grinder, and associated control valves. Install and commission ne

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Waste Processing and Treatment, Commercial
Location
Tigard, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Durham WRRF Digester Phase 6B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Durham WRRF Digester Phase 6B” is an infrastructure initiative in the Water Supply and Storage sector, located in Tigard, Oregon, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construct and commission a new 1.3-million gallon, cast-in-place concrete, anaerobic digester with a vertical mixer mixing system (new digester). b. Install and commission new digester support systems including, but not limited to, a new spiral heat exchanger, hot water pump and piping, digester sludge recirculation pump and piping, grinder, and associated control valves. Install and commission new redundant digester sludge recirculation pumps for the existing Digester Complex 2 (DC2) digeste...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Tigard

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Waste Processing and Treatment, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project