logo
ProjectClosed

Durrance Road Bridge Replacement REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The District of Saanich is undertaking a project to replace the existing timber frame bridge that crosses Tod Creek at Durrance Road with a clear span pre-cast concrete box stringer bridge. This bridge serves as the main access to 22 rural properties off Wallace Drive and was identified for replacement during a structural assessment review. The new bridge will feature 2-way vehicular travel and a

Status
Closed
Sector
Government, Forest Products and Packaging, Commercial, Bridge, Road, Cement
Location
Victoria, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Durrance Road Bridge Replacement REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Durrance Road Bridge Replacement REBID” is an infrastructure initiative in the Government sector, located in Victoria, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The District of Saanich is undertaking a project to replace the existing timber frame bridge that crosses Tod Creek at Durrance Road with a clear span pre-cast concrete box stringer bridge. This bridge serves as the main access to 22 rural properties off Wallace Drive and was identified for replacement during a structural assessment review. The new bridge will feature 2-way vehicular travel and a pedestrian walkway on one side. The new bridge is designed to increase the span width over the cr...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Victoria

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Forest Products and Packaging, Commercial, Bridge, Road, Cement

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project