Dushanbe Solid Waste Management Project
One of 2,118 projects Taiyo tracks in Tajikistan.
Source: European Bank for Reconstruction and Development (EBRD)
The Project objectives are to assist the City of Dushanbe to: rehabilitate the existing landfill site and collection points, supply new landfill equipment; and supply new collection vehicles, containers and equipment. Other objectives include assisting the City to re-organise and improve solid waste collection and disposal in Dushanbe. The City of Dushanbe. Up to USD 4 million (EUR 2.56 million eq
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Biomass, Residential, Waste Processing and Treatment, Automotive
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Dushanbe Solid Waste Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project objectives are to assist the City of Dushanbe to: rehabilitate the existing landfill site and collection points, supply new landfill equipment; and supply new collection vehicles, containers and equipment. Other objectives include assisting the City to re-organise and improve solid waste collection and disposal in Dushanbe. The City of Dushanbe. Up to USD 4 million (EUR 2.56 million equivalent) loan to the City of Dushanbe with a sovereign guarantee of the Republic of Tajikistan. USD 11.71 million (EUR 7.5 million equivalent). Screened B/1. The project will bring substantial environmental, health and safety benefits to the City of Dushanbe and surrounding communities by providing an adequate and affordable municipal waste management system. However, the rehabilitation of the existing landfill serving the City of Dushanbe may be associated with a number of environmental issues resulting from its current operations and past use. An Environmental Audit of the City of Dushanbe municipal solid waste management system including the exiting landfill site will need to be carried out to identify and assess any environment-related risks and liabilities, such as soil, groundwater and surface water contamination. A detailed Site Environmental Analysis will be carried out to identify and assess environmental, health and safety issues associated with the rehabilitation programme and to determine measures for their mitigation. The project components will need to meet national and EU environmental standards. Pre-signing Financial, technical, environmental, and social impact due diligence plus environmental field investigations of the landfill site - financed by the Swedish International Development Agency. Post-signing |
Original sector | Municipal Infrastructure |
Location
Country | Tajikistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Biomass, Residential, Waste Processing and Treatment, Automotive |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
