Dushanbe-Uzbekistan Border Road Improvement Project

Sector: Road • Location: Tajikistan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

The Project covers rehabilitation and upgrade of the 62 kilometre road linking the city of Dushanbe to the Uzbek border and connecting Tajikistan to the Russian Federation to the north (via Uzbekistan) with onward links to Turkey and Western Europe (e.g., via Caspian Sea routes). The road is a part of the CAREC corridor Programme which seeks to expand trade and improve competitiveness through focu

Project Information FAQ

Project Information

4 Q
The project “Dushanbe-Uzbekistan Border Road Improvement Project” is an infrastructure initiative in the Road sector, located in Tajikistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project covers rehabilitation and upgrade of the 62 kilometre road linking the city of Dushanbe to the Uzbek border and connecting Tajikistan to the Russian Federation to the north (via Uzbekistan) with onward links to Turkey and Western Europe (e.g., via Caspian Sea routes). The road is a part of the CAREC corridor Programme which seeks to expand trade and improve competitiveness through focused action by all multilateral partners (i.e. ADB, EBRD, IMF, IDF, WB and UN) in transport initiatives, trade facilitation, energy, trade policy, and economic corridor development. The road consists of 5 sections. The upgrade of Sections 2 to 5 (from Western Gate of Dushanbe to the Tajik – Uzbek border) of approximately 57 km in length was financed by ADB grant. Section 1 of approximately 4.6 km in length is located within the urban area (between the Avicenna Monument to the Western Gate of Dushanbe) and includes 82nd roundabout and Avicenna roundabout. The EBRD and AIIB loan proceeds will cover the financing required to complete Section 1 and thus complete the whole road. The key transition objectives for the Project include the following: The Borrower is Republic of Tajikistan. The Project will be implemented by the Ministry of Transport and Communications. A sovereign loan to the Republic of Tajikistan in an amount up to US$ 62.5 million. The project cost for Section 1 is expected to be US$ 90 million including EBRD’s sovereign loan to be co-financed by the AIIB, and Technical Cooperation grants from EBRD and donors totalling US$ 2.5 million. The Project was originally categorised B and structured to meet the EBRD Environmental and Social Policy (2008) as the potential impacts are expected to be site specific, readily identified and addressed through mitigation measures which were defined within an Environmental and Social Action Plan (ESAP).  The Somoni Avenue reconstruction is one of a number of roads that will link with the M41 highway reconstruction (Dushanbe to Uzbekistan border) that was partly financed by the ADB. Independent consultants were appointed to undertake the environmental and social due analysis for the project. As the road shall connect with an ADB road development that has an Environmental Impact Assessment (EIA) and established Land Acquisition and Resettlement Plan, these documents were taken into account in the EBRD environmental and social due diligence. No previous stakeholder consultations for this specific road section had been carried out and, therefore, a social survey, stakeholder identification and evaluation were undertaken. Currently Somoni Avenue surface water is collected in drainage channels that discharge water into the Gissar Canal. During high rainfall the drainage systems often cannot accommodate water, and flooding occurs. In addition, the current road is associated with safety concerns because while there are pedestrian crossings evenly distributed throughout Somoni Avenue they are poorly marked, only one is regulated with traffic lights and many are reported to be placed incorrectly. The central island of the road is intensively used by pedestrians to cross the road. The road widening may result in the loss of some rows of plane trees (chinar) that were planted in the 1960’s and provide shade and visual barrier. The project will involve: widening of the road, from three lanes to four; construction of a flyover and underpass; removal of the existing concrete pavement and then construction of a new asphalt road. The potential environmental and social impacts associated with these works include: construction impacts such as health and safety concerns, noise (particularly at night during construction) and dust; loss of trees; potential visual and cultural heritage impacts as the Avicenna flyover is likely to affect the view of the Avicenna monument from the south; and road safety risks due to temporary traffic disruptions. The potential benefits of the Project include reduced traffic congestion, reduced air emissions and road safety improvements, particularly through improvements to road crossings. Since Board approval the project has proceeded with detailed design. There have been some design changes primarily to improve road safety including the introduction of additional pedestrian underpasses.  An updated environmental and social analysis was also prepared.  The Bank has reviewed the updated information and the new impacts that results from the updated design, which are that that 9 business units adjacent to the road will be lost and the West Gate and Avicenna Monument and adjacent structures are to be demolished.   The ESAP has been updated as a result. In March 2018 a detailed Resettlement Action Plan (RAP ) was finalized, outlining general principles, procedures and entitlement framework with regard to compensation and assistance to project affected people(PAP) in line with PR 5, following extensive consultations with PAPs. Permanent land acquisition and resettlement of households will be required for 612 persons in 88 affected structures. The affected structures are predominantly mixed residential and commercial. The Project Implementation Unit for Road Rehabilitation (PIURR) set up within the Ministry of Transport (MoT) will be responsible for implementation of the RAP and reporting to the Bank.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data