Dutchess Hall Elevator Addition REBID
One of 10,000+ projects Taiyo tracks in New York.
Source: Dodge
Construction of a 220 +/- square foot addition to create an entrance vesibule and to accommodate the installation of a machine room less traction elevator, the installation of a comcrete pad mounted natural gas generator and other work indicated in the Contract Documents.
- Status
- Closed
- Sector
- Natural Gas, Education, Commercial, Manufacturing (Industrial)
- Location
- Poughkeepsie, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dutchess Hall Elevator Addition REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 220 +/- square foot addition to create an entrance vesibule and to accommodate the installation of a machine room less traction elevator, the installation of a comcrete pad mounted natural gas generator and other work indicated in the Contract Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Poughkeepsie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Education, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Natural Gas projects in United States of America
- Naval Support Facility Decentralized Steam System
- Energy Reductions using Cold Water for Laundry
- BLM-ES, Study of Air Emissions and Effects of Best Management Practices at Oil and Gas Sites in the Northern Appalachian Basin
- Solar Energy Grid Integration Systems - Advanced Concepts
- Methane Hydrate Resource Assessment
- Raptor Monitoring for the Pinedale Anticline Project Area (MLR)
- RFI: Advanced Thermal Insulation & Composite Material Compatibility for Cold/Cryogenic Compressed Gas Fuel Storage for Onboard Vehicles Applications
- FY22 BETO Waste Feedstocks and Conversion R&D
