Duxbury Road Repair and Slope Stabilization Project
Sector: Road • Location: Bolton, Vermont, United States
Source: Waterbury Roundabout
Road repair and slope stabilization project on Duxbury Road in Bolton including installation of a Scourlok-brand streambank erosion control system along a 1/4-mile stretch between the Long Trail footbridge over the Winooski River and Honey Hollow Road. The project is scheduled for completion by Nov. 18, 2025.
- Status
- Under Construction
- Sector
- Road
- Location
- Bolton, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Waterbury Roundabout
ConstructChat
Ask ConstructChat about Duxbury Road Repair and Slope Stabilization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Road repair and slope stabilization project on Duxbury Road in Bolton including installation of a Scourlok-brand streambank erosion control system along a 1/4-mile stretch between the Long Trail footbridge over the Winooski River and Honey Hollow Road. The project is scheduled for completion by Nov. 18, 2025. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Vermont |
City | Bolton |
Source
Source | Waterbury Roundabout |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-11-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
