DWSRF Infrastructure Improvements Project Contract 5
Sector: Waste Processing and Treatment • Location: Frisco City, Alabama, United States of America
Source: Dodge
Mexia Water System DWSRF Infrastructure Improvements Project Contract No. 5 / Back-Up Well Pump and Pipe Installation Project - DWSRF PROJECT NO. FS010356-01. The principal items of work are detailed herein below: 1. Install necessary Pump, Motor; Concrete Pump Pedestal/Foundation and Piping Assembly from Well #2 to Existing Well #1 Discharge Header 2. Provide Electrical Connections for the New We
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Cement, Government
- Location
- Frisco City, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about DWSRF Infrastructure Improvements Project Contract 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mexia Water System DWSRF Infrastructure Improvements Project Contract No. 5 / Back-Up Well Pump and Pipe Installation Project - DWSRF PROJECT NO. FS010356-01. The principal items of work are detailed herein below: 1. Install necessary Pump, Motor; Concrete Pump Pedestal/Foundation and Piping Assembly from Well #2 to Existing Well #1 Discharge Header 2. Provide Electrical Connections for the New Well #2 and Install VFD s for both Wells #1 and #2 3. Install New Motor and New Pump Assembly for E... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Frisco City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
