Dyke Rehabilitation
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project involves raising and reconstructing the southern dyke of the Hillman Marshland for a 1 in 100 year peak water level to avoid flooding of southern Leamington and the Caldwell First Nations. Armour stone will be added to the northern face of the marshlands to lessen the impact of tidal forces, clay will be added to the dyke to strengthen its integrity, and muskrat holes will be filled.
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Dyke Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves raising and reconstructing the southern dyke of the Hillman Marshland for a 1 in 100 year peak water level to avoid flooding of southern Leamington and the Caldwell First Nations. Armour stone will be added to the northern face of the marshlands to lessen the impact of tidal forces, clay will be added to the dyke to strengthen its integrity, and muskrat holes will be filled. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
