logo

Dynamic Limits DER Feasibility Study

Sector: Geothermal • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Close

The Dynamic Limits DER Feasibility Study will explore implementing dynamic distributed energy resources (DER) export limits to better manage voltage and thermal constraints on the electricity network.The study will examine existing approaches to managing network capacity constraints, investigate the general technical feasibility of implementing a dynamic DER control scheme, and undertake a site-sp

Project Information FAQ

Project Information

5 Q
The project “Dynamic Limits DER Feasibility Study” is an infrastructure initiative in the Geothermal sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dynamic Limits DER Feasibility Study will explore implementing dynamic distributed energy resources (DER) export limits to better manage voltage and thermal constraints on the electricity network.The study will examine existing approaches to managing network capacity constraints, investigate the general technical feasibility of implementing a dynamic DER control scheme, and undertake a site-specific analysis, examining implementation on feeders experiencing constraints.How the project worksCurrently there is a limit to the amount of renewable energy resources that Australia’s network can host. In an attempt to prevent capacity limits from being exceeded, static data and other basic measures (such as zero export limits) are used in calculations. This project will look at whether using dynamic data (or actual data) can increase the DER capacity limits on the NSW distribution network. This would be known as the Dynamics Limit Control Scheme.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data