E 20th St Bridge Replacement REBID
Sector: Water Supply and Storage • Location: Dover, Ohio, United States of America
Source: Dodge USA
Upgrading 0.04 Miles of East 20th Street by replacing the existing structure SFN 7960190. The project also includes replacing both approaches with full depth pavement, re-routing existing storm sewer, water line replacement, sanitary sewer replacement, traffic control signs and pavement markings.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Dover, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about E 20th St Bridge Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upgrading 0.04 Miles of East 20th Street by replacing the existing structure SFN 7960190. The project also includes replacing both approaches with full depth pavement, re-routing existing storm sewer, water line replacement, sanitary sewer replacement, traffic control signs and pavement markings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Dover |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
