E 38th St Hyde Park WW Pipeline Renewal
Sector: Water Supply and Storage • Location: Austin, Texas, United States of America
Source: Dodge USA
Hyde Park (E 38th St/Grooms St/Avenue F) WW Pipeline Renewal The Work consists of 1,800 linear feet of 8-inch PVC SDR26 wastewater main and appurtenances, 4-ft diameter wastewater Manholes and connect existing wastewater service connection as shown on the plan. Restoration of disturbed existing condition shall be accomplished by use of sodding. Saw cutting will be used to remove existing pavement,
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Automotive, Road, Government, Cement, Commercial, Waste Processing and Treatment
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about E 38th St Hyde Park WW Pipeline Renewal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hyde Park (E 38th St/Grooms St/Avenue F) WW Pipeline Renewal The Work consists of 1,800 linear feet of 8-inch PVC SDR26 wastewater main and appurtenances, 4-ft diameter wastewater Manholes and connect existing wastewater service connection as shown on the plan. Restoration of disturbed existing condition shall be accomplished by use of sodding. Saw cutting will be used to remove existing pavement, sidewalk, curb and gutter etc. Debris will be removed and hauled daily. Concrete finisher, paint... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Automotive, Road, Government, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
