E 5000 N Hog Canal Bridge Reconstruction
Bid results · Idaho · Last reported Jul 2024
Source: Dodge USA
The work involves 0.12 mile road reconstruction of E5000N and box culvert installation. Project consists of approximately 0.19 acres of clearing and grubbing, 380 cy of fill, 30 cy of cut, 1085 cy of pit run, 225 cy of 2" minus, 655 cy of 3/4" minus, 150 sy of riprap slope and outlet protection, 0.11 ac of seeding, 30 feet of 24" corrugated metal culvert installation, 42 feet of 12' X 4' reinforce
- Status
- Closed
- Sector
- Metal, Waste Processing and Treatment, Commercial, Bridge, Cement, Road, Water Supply and Storage, Government
- Location
- Driggs, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about E 5000 N Hog Canal Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work involves 0.12 mile road reconstruction of E5000N and box culvert installation. Project consists of approximately 0.19 acres of clearing and grubbing, 380 cy of fill, 30 cy of cut, 1085 cy of pit run, 225 cy of 2" minus, 655 cy of 3/4" minus, 150 sy of riprap slope and outlet protection, 0.11 ac of seeding, 30 feet of 24" corrugated metal culvert installation, 42 feet of 12' X 4' reinforced concrete culvert installation, and other miscellaneous work. Scope includes coordinating design... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Driggs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Waste Processing and Treatment, Commercial, Bridge, Cement, Road, Water Supply and Storage, Government |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
