E-60 RUSTAVI - RED BRIDGE SECTION (FL 20170159))
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
This is the first allocation under the existing Georgia Transport Connectivity II Framework Loan (FL) approved by the Bank on 30 November 2018 and signed on 19 February 2019. It consists of the upgrade of the Rustavi-Red Bridge road (approximately 32 km) which is the main road connecting Georgia to Azerbaijan. Rustavi-Red Bridge is part of the E-60 highway and the extended Trans-European Transport
- Status
- Prospective
- Sector
- Road, Bridge, Government
- Location
- Georgia
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about E-60 RUSTAVI - RED BRIDGE SECTION (FL 20170159))
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This is the first allocation under the existing Georgia Transport Connectivity II Framework Loan (FL) approved by the Bank on 30 November 2018 and signed on 19 February 2019. It consists of the upgrade of the Rustavi-Red Bridge road (approximately 32 km) which is the main road connecting Georgia to Azerbaijan. Rustavi-Red Bridge is part of the E-60 highway and the extended Trans-European Transport Network (TEN-T) core network in Georgia. |
Original sector | Transport |
Location
Country | Georgia |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
