logo
ProjectForthcoming

E-Boiler TotalEnergies Refinery Antwerp

The status, timeline and source of this project. A free account opens every field.

Source: EU Funding & Tenders Portal

The project P2H-RC1-TERA aims to implement a large-scale electrification of medium pressure steam generation within the existing TotalEnergies refinery energy system located in Antwerp, Belgium, enabling a sustained reduction in natural gas consumption and associated Scope 1 CO2 emissions, while preserving operational reliability. The objective will be achieved through the integration of a 45 MW e

Status
Prospective
Sector
Oil and Gas, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial)
Location
Belgium
Updated
19 Nov 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about E-Boiler TotalEnergies Refinery Antwerp

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “E-Boiler TotalEnergies Refinery Antwerp” is an infrastructure initiative in the Oil and Gas sector, located in Belgium. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

forthcoming

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project P2H-RC1-TERA aims to implement a large-scale electrification of medium pressure steam generation within the existing TotalEnergies refinery energy system located in Antwerp, Belgium, enabling a sustained reduction in natural gas consumption and associated Scope 1 CO2 emissions, while preserving operational reliability. The objective will be achieved through the integration of a 45 MW electric boiler capable of producing 65-70 tonnes per hour of saturated steam into the existing 14 barg header at 198°C. This corresponds to an annual heat output of roughly 100 882 MWhth. The e-boiler will supply part of the refinery’s steam demand that is currently met by natural gas-based assets, without requiring modifications to downstream process units or changes to refinery throughput. This installation is expected to avoid 17 150 tonnes of CO2 per year by reduction of consumption of natural gas by the existing units. The project advances the Clean Industrial Deal through large-scale electrification, by demonstrating replicable Power to Heat solutions for large industrial sites. This model enables high flexibility, by adjusting electricity consumption to periods of high renewable generation and low power prices, and optimise asset utilisation, reducing reliance on fossil-based installations while maintaining operational resilience. Finally, this transition will benefit the industrial resilience of the European Economic Area (EEA), since the main equipment (the electric boiler) is to be provided by European supplier.

Location

Country

Belgium

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Oil and Gas, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2026-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project