E-Boiler TotalEnergies Refinery Antwerp
The status, timeline and source of this project. A free account opens every field.
Source: EU Funding & Tenders Portal
The project P2H-RC1-TERA aims to implement a large-scale electrification of medium pressure steam generation within the existing TotalEnergies refinery energy system located in Antwerp, Belgium, enabling a sustained reduction in natural gas consumption and associated Scope 1 CO2 emissions, while preserving operational reliability. The objective will be achieved through the integration of a 45 MW e
- Status
- Prospective
- Sector
- Oil and Gas, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Belgium
- Updated
- 19 Nov 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about E-Boiler TotalEnergies Refinery Antwerp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | forthcoming |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project P2H-RC1-TERA aims to implement a large-scale electrification of medium pressure steam generation within the existing TotalEnergies refinery energy system located in Antwerp, Belgium, enabling a sustained reduction in natural gas consumption and associated Scope 1 CO2 emissions, while preserving operational reliability. The objective will be achieved through the integration of a 45 MW electric boiler capable of producing 65-70 tonnes per hour of saturated steam into the existing 14 barg header at 198°C. This corresponds to an annual heat output of roughly 100 882 MWhth. The e-boiler will supply part of the refinery’s steam demand that is currently met by natural gas-based assets, without requiring modifications to downstream process units or changes to refinery throughput. This installation is expected to avoid 17 150 tonnes of CO2 per year by reduction of consumption of natural gas by the existing units. The project advances the Clean Industrial Deal through large-scale electrification, by demonstrating replicable Power to Heat solutions for large industrial sites. This model enables high flexibility, by adjusting electricity consumption to periods of high renewable generation and low power prices, and optimise asset utilisation, reducing reliance on fossil-based installations while maintaining operational resilience. Finally, this transition will benefit the industrial resilience of the European Economic Area (EEA), since the main equipment (the electric boiler) is to be provided by European supplier. |
Location
Country | Belgium |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Natural Gas, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
