E-buses Chile
Sector: Electric Vehicles (EVs) • Location: Chile
Source: IFC Project Disclosures
IFC's proposed investment is US$120 million A Loan and a US$184 million parallel/B loan to fund the procurement of up to 992 electric buses (E-buses) for use in the public transit system, the Red Metropolitana de Movilidad, of the Santiago metropolitan area in Chile (the Project).A special purpose vehicle (“SPV”) called Suministradora de Buses K Cuatro (the Company), a subsidiary of Grupo Kaufmann
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Rail, Mass Transit, Energy Storage, Automotive
- Location
- Chile
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about E-buses Chile
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | IFC's proposed investment is US$120 million A Loan and a US$184 million parallel/B loan to fund the procurement of up to 992 electric buses (E-buses) for use in the public transit system, the Red Metropolitana de Movilidad, of the Santiago metropolitan area in Chile (the Project).A special purpose vehicle (“SPV”) called Suministradora de Buses K Cuatro (the Company), a subsidiary of Grupo Kaufmann (Kaufmann) and Enel X Chile (Enel and together the Sponsors),will own the E-buses, manufactured by Foton Motor Company (Foton), a leading Chinese manufacturer. Foton uses batteries from CATL, which is today the world's largest EV battery company. The total project cost is estimated at US$460 million. The E-buses will operate under 14-year bus supply contracts to be awarded as part of the ongoing fleet renewal, and expansion tender carried out by Chile's Ministry of Transportation and Telecommunications (MTT). This tender was held in the context of a restructuring of the operating model for public bus transportation in Chile, wherein separate contracts are awarded for (i) the supply of buses and (ii) their operation and maintenance. IFC's proposed investment in the company is for the supply of E-buses only. The bus supply contract requires the supplier (i.e., the company) to ensure the E-buses meet the specifications established during the tendering process, train the operator's maintenance staff and drivers, and develop a maintenance plan, which will be implemented by the bus operator. The bus supply contract also requires the bus supplier to replace the batteries once they no longer comply with the minimum range specification. Furthermore, the supplier must provide warranties for the buses supplied, and within the framework of these warranties, must carry out diagnoses and repairs requested by the operator. The operator may also request additional spare parts, diagnostics, and repairs from the supplier. Finally, the supplier must overhaul each bus in year seven or when it reaches half the mileage associated with its useful life. When requested by the MTT, the supplier must remove the buses at the end of the contract term or at the end of their useful life. In this case, the supplier must manage their final disposal or destruction in an authorized place. The project will reduce Santiago's mass transit system's carbon footprint by replacing diesel buses with E-buses. Reducing carbon emissions is a national priority for Chile under the commitment to the Paris Agreement; the project supports the National Electromobility Strategy's goal of 100% of sales of light and medium vehicles, 100% of sales of public transport vehicles (buses, taxis and collective taxis) and 100% of sales of large mobile machinery to be zero-emission by 2035.                   |
Original sector | E-AD - Transit and Ground Passenger Transporation |
Location
Country | Chile |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Rail, Mass Transit, Energy Storage, Automotive |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project