logo

E. Cherrywood Lane Drainage

Sector: Cement • Location: Pearl River, Louisiana, United States of America

Source: Dodge USA

Project
Closed

remove/replace storm drain pipe/catch basin/ concrete driveway, to improve area drainage at locations identified on E Cherrywood Ln (R08A053) Section 14 Township 8S Range 14E, in Pearl River, LA

Status
Closed
Sector
Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Raw Materials
Location
Pearl River, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about E. Cherrywood Lane Drainage

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “E. Cherrywood Lane Drainage” is an infrastructure initiative in the Cement sector, located in Pearl River, Louisiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

remove/replace storm drain pipe/catch basin/ concrete driveway, to improve area drainage at locations identified on E Cherrywood Ln (R08A053) Section 14 Township 8S Range 14E, in Pearl River, LA

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Pearl River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Cement, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Raw Materials

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project