E Plum Drainage Improvements
Sector: Water Supply and Storage • Location: Pearland, Texas, United States of America
Source: Dodge
The project area is located between Old Alvin Rd and Schlieder Dr. along E Plum Street. Approximately 2000 LF drainage improvements for the project limits will require the removal/replacement of driveways, driveway culverts, storm system, inlets, utility adjustment, and regrading of the roadside ditches to improve the drainage conveyance. The project will also include mill and overlay of existing
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Power Transmission, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about E Plum Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project area is located between Old Alvin Rd and Schlieder Dr. along E Plum Street. Approximately 2000 LF drainage improvements for the project limits will require the removal/replacement of driveways, driveway culverts, storm system, inlets, utility adjustment, and regrading of the roadside ditches to improve the drainage conveyance. The project will also include mill and overlay of existing asphalt pavement within the project limit. The drainage system will be upgraded to meet the curre... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Transmission, Government, Road, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
