E-Power S.A.
Sector: Raw Materials • Location: Haiti
Source: International Finance Corporation (IFC)
The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP Int
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP International Airport. The facility will consist of 8 (eight) Hyundai HIMSEN H32/40 generating sets, operating at 720 rpm, on Bunker C#6, four heavy fuel treatment units, one heat recovery steam generator (HRSG), one steam turbine set, a cooling tower, and associated auxiliary facilities. Each thermal power plant will consist of a 9-cylinder turbo-charged, highly efficient HIMSEN engine. Each engine will have its own generator. The units will be fired using #2 distillate fuel oil but will run on #6 Heavy Fuel Oil. Additionally the project will involve a 3-km-69 kw transmission line and a 4.5-km long pipeline.Engineering, Procurement and Construction (“EPC”) contractors will be the Korean companies Hyundai and DECCO, on a full-turnkey basis. Construction period is expected to be eighteen months. Total project costs are estimated at US$50 million to be financed on a 75:25 debt to equity basis. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |