E-Power S.A.
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP Int
- Status
- Closed
- Sector
- Raw Materials, Power Generation (CCGT), Geothermal, Airport, Oil and Gas, Wind, Government
- Location
- Haiti
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about E-Power S.A.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP International Airport. The facility will consist of 8 (eight) Hyundai HIMSEN H32/40 generating sets, operating at 720 rpm, on Bunker C#6, four heavy fuel treatment units, one heat recovery steam generator (HRSG), one steam turbine set, a cooling tower, and associated auxiliary facilities. Each thermal power plant will consist of a 9-cylinder turbo-charged, highly efficient HIMSEN engine. Each engine will have its own generator. The units will be fired using #2 distillate fuel oil but will run on #6 Heavy Fuel Oil. Additionally the project will involve a 3-km-69 kw transmission line and a 4.5-km long pipeline.Engineering, Procurement and Construction (“EPC”) contractors will be the Korean companies Hyundai and DECCO, on a full-turnkey basis. Construction period is expected to be eighteen months. Total project costs are estimated at US$50 million to be financed on a 75:25 debt to equity basis. |
Original sector | AC - Heavy Fuel Oil - Thermal Power Generation |
Location
Country | Haiti |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Generation (CCGT), Geothermal, Airport, Oil and Gas, Wind, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Haiti
- Establishing a Joint Venture/Purchase of new machinery and equipment/Agriculture, hunting and forestry/Telfils Café Lux
- Carifresh
- Establishing a Joint Venture/Purchase of new machinery and equipment/Agriculture, hunting and forestry/Choko Lakay
- Open for FDI through a minority stake/Development of a new project/Agriculture, hunting and forestry/TOMPAC S.A.
- Establishing a Joint Venture/Establishment of an additional production facility/Agriculture, hunting and forestry/Leriche Miel, Entreprise Apicole
- Carifresh III
- Integrated Management Rio Libon
- Rehabililtation and reduction of vulnerability of economic bases of small farming agriculture
