E-Power S.A.

Sector: Raw Materials • Location: Haiti

Source: International Finance Corporation (IFC)

Project
Completed

The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP Int

Project Information FAQ

Project Information

4 Q
The project “E-Power S.A.” is an infrastructure initiative in the Raw Materials sector, located in Haiti. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed E-Power Thermal Power Plant (“the Project”) involves the construction, operation, maintenance and decommissioning of a 31.2 MW diesel power plant using heavy fuel oil (“HFO”) on a build-own-and-operate (“BOO”) basis in PAP. The project will be constructed in Drouillard, Cité Soleil, on a 50,000 m2 site located in the Hispaniola Investment Company (HINSA) free zone, west of the PAP International Airport. The facility will consist of 8 (eight) Hyundai HIMSEN H32/40 generating sets, operating at 720 rpm, on Bunker C#6, four heavy fuel treatment units, one heat recovery steam generator (HRSG), one steam turbine set, a cooling tower, and associated auxiliary facilities. Each thermal power plant will consist of a 9-cylinder turbo-charged, highly efficient HIMSEN engine. Each engine will have its own generator. The units will be fired using #2 distillate fuel oil but will run on #6 Heavy Fuel Oil. Additionally the project will involve a 3-km-69 kw transmission line and a 4.5-km long pipeline.Engineering, Procurement and Construction (“EPC”) contractors will be the Korean companies Hyundai and DECCO, on a full-turnkey basis. Construction period is expected to be eighteen months. Total project costs are estimated at US$50 million to be financed on a 75:25 debt to equity basis.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data