E Surfside Boulevard Paving Improvements
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge
E. Surfside Boulevard, from Breakwater Avenue to Elm Street, is a roadway reconstruction project that includes various street and utility improvements. The project objective is to reconstruct the existing roadway pavement section and to reconstruct select underground utilities. This project also includes reconstruction of some of the existing sidewalk, curb ramps, concrete driveways, concrete curb
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government
- Location
- Corp Christi, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about E Surfside Boulevard Paving Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | E. Surfside Boulevard, from Breakwater Avenue to Elm Street, is a roadway reconstruction project that includes various street and utility improvements. The project objective is to reconstruct the existing roadway pavement section and to reconstruct select underground utilities. This project also includes reconstruction of some of the existing sidewalk, curb ramps, concrete driveways, concrete curb and gutter, roadway striping, roadway pavement markers, and traffic signage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Corp Christi |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
