logo

E University Avenue at NE 26th Terrace Safety Improvements

Sector: Car parking • Location: Gainesville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

FDOT has begun work on a safety improvements project on E University Avenue at NE 26th Terrace, adjacent to the Fred Cone Park. The installation of a mid-block crossing and Pedestrian Hybrid Beacon (PHB) will improve safety and increase pedestrian mobility on E University Avenue by providing pedestrians with a place to safely cross. PHBs are advanced crosswalk systems that control both vehicle and

Project Information FAQ

Project Information

5 Q
The project “E University Avenue at NE 26th Terrace Safety Improvements” is an infrastructure initiative in the Car parking sector, located in Gainesville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

FDOT has begun work on a safety improvements project on E University Avenue at NE 26th Terrace, adjacent to the Fred Cone Park. The installation of a mid-block crossing and Pedestrian Hybrid Beacon (PHB) will improve safety and increase pedestrian mobility on E University Avenue by providing pedestrians with a place to safely cross. PHBs are advanced crosswalk systems that control both vehicle and pedestrian movements using traffic signals. For a video on how PHBs operate, please click the link below. Pedestrian Hybrid Beacon Video Traffic will be maintained in accordance with FDOT standards. Drivers can expect single-lane closures for both directions of University Avenue during off-peak hours. Pedestrians will also see periodic sidewalk closures and pedestrian detours. FDOT encourages drivers and pedestrians to obey traffic laws, be alert to construction workers and traffic devices, and to closely follow signage along the detour routes. FDOT selected American Lighting and Signalization LLC to complete this $323,000 project by fall 2023, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data