E10 Shinkansen Bullet Train Project in India
Sector: Road • Location: Mumbai, Ahmedabad, India
Source: TechnoSports Media Group
India and Japan are set to introduce the next-generation E10 Shinkansen bullet train simultaneously in 2029-30. The project includes the Mumbai-Ahmedabad corridor as the launch platform, with 12 planned stations along a 508-kilometer route. The project represents a significant upgrade in high-speed rail technology and includes a massive $67 billion investment target from Japan over the next decade
- Status
- Prospective
- Sector
- Road, Rail, Government
- Location
- Mumbai, Ahmedabad, India
- Updated
- 22 Jul 2026
- Source
- TechnoSports Media Group
ConstructChat
Ask ConstructChat about E10 Shinkansen Bullet Train Project in India
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | India and Japan are set to introduce the next-generation E10 Shinkansen bullet train simultaneously in 2029-30. The project includes the Mumbai-Ahmedabad corridor as the launch platform, with 12 planned stations along a 508-kilometer route. The project represents a significant upgrade in high-speed rail technology and includes a massive $67 billion investment target from Japan over the next decade. |
Original sector | Transportation |
Budget |
Location
Country | India |
City | Mumbai, Ahmedabad |
Source
Source | TechnoSports Media Group |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
