logo

E67 A7 Kekava Bypass PPP project

Sector: Commercial • Location: Latvia

Source: InfraPPPWorld

Project
Financial Close

The project consists of the design, build, finance and operation (DBFO) of approximately 17.5 km of the A7 motorway in Latvia. The A7 section from Riga to the Lithuanian border is one of the major national motorways and part of the Trans­European Transport Network (TEN­-T), as well as part of the Via Baltica. It will also include the construction of a new, 14.4 km-long speed section (bypass) to Ke

Project Information FAQ

Project Information

5 Q
The project “E67 A7 Kekava Bypass PPP project” is an infrastructure initiative in the Commercial sector, located in Latvia. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

financial close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the design, build, finance and operation (DBFO) of approximately 17.5 km of the A7 motorway in Latvia. The A7 section from Riga to the Lithuanian border is one of the major national motorways and part of the Trans­European Transport Network (TEN­-T), as well as part of the Via Baltica. It will also include the construction of a new, 14.4 km-long speed section (bypass) to Kekava - a town currently crossed by the existing A7 road. and reconstruction of the existing road (3.1 km). 11.1 km of them planned as a four-lane carriageway and 6.4 km planned carriageway with two lanes. The project includes also four multiple junctions, four tunnels, one bridge, seven roundabouts as well as parallel roads in the total length of 14,4 km. The new road will be a dual carriageway (2x2 lanes) for approximately 13 km. The rest of the section will be 2 lanes. The project includes 4 major interchanges as well as sections with lanes for local traffic.   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data