EAAFB Power Resiliency RTI
Closed · Vermont · Last reported Jul 2025
Source: Dodge
This project consists of but is not limited to installation of underground primary power, to include installation of medium voltage switches and removal of overhead primary Power. Installation of new fiber optics, phone lines and conduit, and removal of overhead and underground fiber optics and phone, and other work described in plans and specs dated May 28, 2025. Contractors are invited to bid on
- Status
- Closed
- Sector
- Telecommunications, Government, Power Transmission, Power Generation (CCGT), Broadband, Commercial
- Location
- Colchester, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about EAAFB Power Resiliency RTI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of but is not limited to installation of underground primary power, to include installation of medium voltage switches and removal of overhead primary Power. Installation of new fiber optics, phone lines and conduit, and removal of overhead and underground fiber optics and phone, and other work described in plans and specs dated May 28, 2025. Contractors are invited to bid on the Ethan Allen Air Force Base Power Resiliency RTI in Colchester, Vermont. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Colchester |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Power Transmission, Power Generation (CCGT), Broadband, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
