logo
ProjectPre-Design

Eagle Avenue Culvert over Mohawk Waterway Replacement

Pre-design · Ontario · Last reported Jul 2024

Source: Dodge USA

Replacing the culvert due to overall deterioration of the structure which was originally constructed 1952. It was also recommended to conduct a hydraulicanalysis prior to replacement to determine if upsizing is required.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Seaport
Location
Brantford, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Eagle Avenue Culvert over Mohawk Waterway Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Eagle Avenue Culvert over Mohawk Waterway Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Brantford, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replacing the culvert due to overall deterioration of the structure which was originally constructed 1952. It was also recommended to conduct a hydraulicanalysis prior to replacement to determine if upsizing is required.

Budget

Location

Country

Canada

State

Ontario

City

Brantford

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Seaport

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project