Eagle Grove - NW 8th Street Reconstruction
Sector: Water Supply and Storage • Location: Eagle Grove, Iowa, United States of America
Source: Dodge
The NW 8th Street Reconstruction Project includes reconstruction of the existing street with concrete paving and select utility improvements. The construction proposed consists of, but is not limited to the following work items: BASE BID Surface Aggregate 30 TON Topsoil, Furnish and Spread 232 TON Pavement Removal, PCC 1030 SY Pavement Removal, HMA 2732 SY Curb & Gutter Removal 1490 LF Sidewalk Re
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Road, Government, Cement, Automotive
- Location
- Eagle Grove, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Eagle Grove - NW 8th Street Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The NW 8th Street Reconstruction Project includes reconstruction of the existing street with concrete paving and select utility improvements. The construction proposed consists of, but is not limited to the following work items: BASE BID Surface Aggregate 30 TON Topsoil, Furnish and Spread 232 TON Pavement Removal, PCC 1030 SY Pavement Removal, HMA 2732 SY Curb & Gutter Removal 1490 LF Sidewalk Removal, PCC 64 SY Sidewalk, PCC, 6" 30 SY Detectable Warnings 20 SF Modified Subbase 1250 TON Driv... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Eagle Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Road, Government, Cement, Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
