Eagle Lake Retention Pond Expansion
Sector: Water Supply and Storage • Location: Eagle Lake, Florida, United States of America
Source: Dodge
- Install silt fence and construction entrance. 2. Provide survey layout and as-builts. 3. Provide dewatering as necessary. 4. Excavate and haul off approximately 3,234 cy of in situ soils and grade the pond expansion as shown on the plans. 5. Install approximately 442 lf of 5 chain link fencing. 6. Provide restoration of damaged sod or paving.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. Install silt fence and construction entrance. 2. Provide survey layout and as-builts. 3. Provide dewatering as necessary. 4. Excavate and haul off approximately 3,234 cy of in situ soils and grade the pond expansion as shown on the plans. 5. Install approximately 442 lf of 5 chain link fencing. 6. Provide restoration of damaged sod or paving. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
