EAGLES LANDING PKWY FM CR 2417 TO CS 867/TALON PLACE-GRTA
Sector: Car parking • Location: Stockbridge, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project is a roadway widening project in Henry County. The project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project will continue the widening of Eagle's Landing Parkway from Eagle's Pointe Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place for a total project length of 2.6 miles. This project will co
- Status
- Closed
- Sector
- Car parking, Bridge, Rail, Road, Government, Automotive
- Location
- Stockbridge, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about EAGLES LANDING PKWY FM CR 2417 TO CS 867/TALON PLACE-GRTA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is a roadway widening project in Henry County. The project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project will continue the widening of Eagle's Landing Parkway from Eagle's Pointe Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place for a total project length of 2.6 miles. This project will construct a 4-lane roadway (2 lanes in each direction) with a 44' wide depressed grass median up to the intersection with SR 42/US 23. After the intersection the roadway will be widened to 4-lanes (2 lanes in each direction) with a 20' wide raised median, which matches the configuration of Phase 1 of East Lake Parkway Extension at the proposed project's eastern terminus. This project includes 4' bike lanes, curb & gutter and 5' wide sidewalks on both sides. Both existing bridges over Norfolk Southern Railroad and Pates Creek will be replaced. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Stockbridge |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Rail, Road, Government, Automotive |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
