logo

EAGLES LANDING PKWY FM CR 2417 TO CS 867/TALON PLACE-GRTA

Sector: Road • Location: Stockbridge, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project is a roadway widening project in Henry County. The project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project will continue the widening of Eagle's Landing Parkway from Eagle's Pointe Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place for a total project length of 2.6 miles. This project will co

Status
Closed
Sector
Road, Car parking, Bridge, Rail, Automotive, Government
Location
Stockbridge, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about EAGLES LANDING PKWY FM CR 2417 TO CS 867/TALON PLACE-GRTA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “EAGLES LANDING PKWY FM CR 2417 TO CS 867/TALON PLACE-GRTA” is an infrastructure initiative in the Road sector, located in Stockbridge, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project is a roadway widening project in Henry County. The project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project will continue the widening of Eagle's Landing Parkway from Eagle's Pointe Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place for a total project length of 2.6 miles. This project will construct a 4-lane roadway (2 lanes in each direction) with a 44' wide depressed grass median up to the intersection with SR 42/US 23. After the intersection the roadway will be widened to 4-lanes (2 lanes in each direction) with a 20' wide raised median, which matches the configuration of Phase 1 of East Lake Parkway Extension at the proposed project's eastern terminus. This project includes 4' bike lanes, curb & gutter and 5' wide sidewalks on both sides. Both existing bridges over Norfolk Southern Railroad and Pates Creek will be replaced.

Location

Country

United States of America (USA)

State

Georgia

City

Stockbridge

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Car parking, Bridge, Rail, Automotive, Government

Article published date

2025-05-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project