Eakas Water Main Extension
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge
Construction of approximately 5,900 feet of watermain ranging in size from 10 to 12 between Unytite Drive and N. 31st Road. Work includes 110 of steel casing installed under the Peru Industrial Railroad by the jack and bore method along with reconstruction of pavements and other miscellaneous appurtenances.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Steel, Commercial, Rail, Road, Manufacturing (Industrial), Raw Materials, Metal
- Location
- Peru, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Eakas Water Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of approximately 5,900 feet of watermain ranging in size from 10 to 12 between Unytite Drive and N. 31st Road. Work includes 110 of steel casing installed under the Peru Industrial Railroad by the jack and bore method along with reconstruction of pavements and other miscellaneous appurtenances. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Peru |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Steel, Commercial, Rail, Road, Manufacturing (Industrial), Raw Materials, Metal |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
